> ## Knowledge Base Index
> Fetch the complete knowledge base index at: https://help.reachboost.io/sitemap.xml
> Use this file to discover available pages before exploring further.
> Pure-Markdown content can be obtained by appending a '.md' suffix to the content URLs listed in the sitemap (without the trailing slash).

# Campaign progress explained

The campaign progress indicator shows how far your campaign has progressed based on the status of every lead in the sequence.
Each lead contributes to the overall progress. A lead can only be in one of these three states:

| Lead status | Progress contribution |
| ----------- | --------------------- |
| Pending     | 0%                    |
| Active      | 50% of a lead         |
| Finished    | 100% of a lead        |

A lead is considered:
* **Pending** when it has not yet started the sequence.
* **Active** after it has received at least one message and is still progressing through the sequence.
* **Finished** when it has completed the sequence or can no longer continue (for example, because it failed).

---

### How progress is calculated

Every lead counts as one point toward the total campaign progress.
For a campaign with **250 leads**, there are **250 total points**, which equals **100%** progress.

The contribution of each lead depends on its current status:
* Pending = **0 points**
* Active = **0.5 points**
* Finished = **1 point**

The total campaign progress is the sum of all lead points divided by the total number of leads.

---

### Example 1

A campaign contains **100 leads**:
* 25 pending = **0%**
* 50 active = **25%**
* 25 finished = **25%**

**Campaign progress: 50%**

---

### Example 2

A campaign contains **250 leads**:
* 150 pending = **0%**
* 50 active = **10%**
* 50 finished = **20%**

**Campaign progress: 30%**
